Consulting

Implementation & Migration

Change planning, cutover runbooks, validation, and hands-on engineering to move from design to production without surprises.

Every engagement starts with a free 30-minute scoping call.

When implementation support helps

  • A significant change is coming and your team cannot absorb it alongside daily operations.
  • The maintenance window is short, the tolerance for disruption is low, and the plan needs to be right the first time.
  • A design from Metis or another firm needs experienced engineers to carry it into production.
  • A migration between platforms, sites, carriers, or cloud providers has to happen without a gap in service.

What we handle

From the migration plan to the last post-change check, with your operations and application teams involved at every step.

  • Migration planning

    Sequencing, dependencies, and rollback paths for every phase of the change.

  • Cutover runbooks

    Step-by-step procedures with checkpoints, owners, and clear decision criteria.

  • Configuration

    Standards-based configuration built from the design and reviewed before it reaches production.

  • Testing & validation

    Pre-change verification, acceptance tests, and evidence that the network behaves as designed.

  • Change-window engineering

    Senior engineers hands-on during the cutover, with rollback ready if it is needed.

  • Stabilization

    Post-change monitoring, tuning, and issue resolution until the environment is steady.

What you receive

A change delivered as designed, and the documentation to operate what was built.

  • Migration planPhases, dependencies, risks, and the rollback path for each stage.
  • RunbooksDetailed cutover procedures your team can follow and reuse.
  • Test plan & resultsWhat was verified, how it was verified, and the evidence that it passed.
  • As-built documentationUpdated diagrams, configurations, and standards that reflect what was actually deployed.
  • Operational handoverWorking sessions and runbooks so your team can operate the new environment with confidence.

How the engagement runs

The same four-phase discipline as every Metis engagement. The design is the input; the work here is the implement and enable phases.

How we work
  1. Understand

    Implementation starts with the design and a migration plan built with your operations and application teams, so that dependencies are understood and change windows are agreed well in advance.

  2. Implement

    Configurations are produced from standards and reviewed before use. During the cutover, Metis engineers work alongside your team, following the runbook, validating each checkpoint, and holding the rollback ready.

  3. Enable

    After the change, we stay until the environment is steady and the documentation reflects reality, then hand over to the team that will run it.

Questions we are asked

The questions that come up on most scoping calls for implementation work.

Do you need write access to our network?

Only during agreed change windows, and only under your change process. Configurations are produced from standards and reviewed with your team before they are used.

Will you be onsite for the cutover?

When it matters, yes. Data center and campus cutovers usually put us in the room; WAN, cloud, and policy changes can often be done remotely with your team on the bridge.

Can you implement a design from another firm?

Yes. We review it first, say what we would change, and then build it as written or as amended. The design does not have to be ours.

Who runs the network after the change?

Your team, or your MSP. We stay until the environment is steady and the documentation reflects reality, then hand over. If you want Metis to keep specific ongoing responsibilities afterward, that is scoped as an advisory retainer, not a managed service contract.

How is implementation priced?

As a fixed fee per milestone, with acceptance criteria agreed up front so both sides know when a milestone is done. Metis does not sell or resell hardware, software, or circuits, and takes no referral fees or commissions from anyone who does. A bill of materials from us is a recommendation, and you buy from whoever you choose.

Start with a 30-minute scoping call.

Tell us where you’re headed and what’s in the way. A senior engineer will call to understand your situation, not to pitch.

  1. We read your message and reply to arrange the call at a time that suits you.
  2. A senior engineer joins the call to understand your environment and what you are trying to achieve.
  3. If there is a fit, you receive a written proposal with scope, deliverables, and price. If there is not, we say so and point you in a better direction.